Our work is architectural detail engineering for Pochen Independant Combined Cycle Power Plant.
Re-bar works for foundation of steam turbine generator(STG) are very complicated and difficult.
The clashes between re-bars and embedded materials in STG foundation caused construction delay and poor workability.
Daewoo E&C has experienced the same difficulties when working on the STG foundation of Pyeongtaek Power Plant project. The main turbine generator ventor is the same as this project.
Our mission is to find the clashes for STG foundation of Pochen power plant and to find optimized reinforcing method to solve structural problems.