Motorway construction Vt4 Kirri-Tikkakoski

About the project

Project category

Infrastructure

Company / Project parties

Finnish Transport Infrastructure Agency, Destia Oy, Welado Oy, Sweco Rakennetekniikka Oy, A-Insinöörit Oy, WSP Finland Oy, Insinööritoimisto Suunnittelukide Oy, B Group (Finland & Lithuania)

Location

Finland

Images

placeholder imageplay button

Motorway construction Vt4 Kirri-Tikkakoski

BIM-based structural design of 29 motorway bridges translated into notable time savings for the contractor 

The Kirri-Tikkakoski motorway construction project encompasses 15 kilometers of new road plus a parallel road in central Finland north of Jyväskylä.

The project includes the construction of 29 bridges and 4.3 km of noise barriers. This is a design-build contract, the development phase of which kicked off in the autumn of 2018. The project is to be completed in November 2023. Its objectives include best-possible transportation service and safety, consistent driving conditions, predictable drive times, and operational reliability of transport.

The project’s cost is estimated at 139 million euros, of which the bridge structures constitute circa 15 million. The bridges require circa 10,000 m3 of concrete, circa 1,300,000 kg of reinforcements and circa 165,000 kg of prestressing steel. There are several different types of bridges designed in the project: 12 prestressed concrete cantilever beam bridges, 5 reinforced concrete cantilever slab bridges, 1 glulam bridge, 4 steel pipe bridges, 4 steel arch bridges, and 3 uncategorized bridges. In addition, the contract includes one concrete bridge to repair.

Sweco Structural Engineering in Finland carries out the BIM-based structural design of the bridges. To begin with, the challenge was to turn traditional construction thinking towards the new BIM way of working. Thanks to some training sessions and guidelines, the models have since then been in good use in the project, and the review process has been successful by all regards. Visualizations and virtual construction by BIM add new value to the traditional drawing-based way of working. In total, the contractor will save from 20 to 25 weeks off the construction schedule by not having to send detailed bridge drawings to inspection and approval.

The bridge models were created with high quality and cost efficiency in Tekla Structures (2017) using Sweco’s own established bridge modeling environment. The company invests in parametric modeling by using the link to Tekla from Rhino and Grasshopper software. This method allows easy exploration of design alternatives particularly in the early phase of design. Trimble Connect is the main real-time data-sharing tool in the project. Bridge models have been reviewed daily using the standard views in Trimble Connect. During the project, the Tekla model has also been viewed using mobile devices.


Production data directly from IFC to rebar supplier’s system for the first time in Finland

This is the first bridge project in Finland where the reinforcement supplier (B Group) obtains the IFC models created in Tekla Structures via Trimble Connect to their own production system. Therefore, the project is an important step forward in utilizing the open standard. Moreover, this is the first bridge project to measure the benefits of modeling by time savings.

The reinforcement supplier’s deliveries on site have been error-free without having to produce toilsome, error-prone rebar lists. In terms of reinforcements, the contents of the models have been divided into separate IFC models following the installation order per plane. The IFCs are easy to use in checking the model or installing reinforcements. The views include “traffic signs”, and by clicking them the user can directly enter drawings and other documents. Construction measurements are also taken from the IFC models. Trimble models were utilized in formwork and scaffolding design, and the CIP contractor obtained structural measurements directly from the IFC models. The BeamExtruder tool, for example, from Tekla Warehouse was used in the design.

One of the special features of the project is the online inspection and approval of 29 bridge designs based on the IFC models easily and in real time by using Trimble Connect Desktop or the web browser. The designs can mostly be inspected and approved without producing drawings. This project includes more bridges and material to combine than an average contract.

Similar smaller projects have been carried out in Finland before where the models have been saved from a project bank, for example, to one’s own computer. However, this project constantly provided up-to-date, bridge-specific model views for all users. The models are saved in Trimble Connect folders following a consistent naming convention until the end of the project so that users always have the latest information at hand whether on a computer at the office or using a tablet on site.

In addition, the project tested the SmartDrawing service developed by Sweco which enables direct access to the bridge BIM by the rebar worker by scanning the QR code in the work order. The bridge fixings have been detailed using Sweco’s custom components and the column reinforcements using macros. The client received both the drawings and the building information model of the bridges.

 

Project parties: 

Client: Finnish Transport Infrastructure Agency

General contractor: Destia Oy

Construction project management: Welado Oy

Structural design (bridges): Sweco Rakennetekniikka Oy 

Road planning: A-Insinöörit Oy

Geotechnical design: Destia Oy

Structural design (noise barriers): WSP Finland Oy

Inspection for structural design: Insinööritoimisto Suunnittelukide Oy

Rebar fabrication and delivery: B Group Suomi, B Group UAB 

Noise barrier fabrication: Sepa Oy

Noise railing fabrication: Rudus Oy

Bridge scaffolding and formwork: Insinööritoimisto TAK-Plan Oy

Bridge lighting design: Licon-AT Oy

 

Tekla BIM Awards

The Tekla BIM Awards honor projects that transform the way the world builds.

See all projects

The Content on this page is provided to Trimble Solutions Corporation ("Trimble") under the Tekla Global BIM Awards Terms and Conditions.

Trimble Logo

INTERNATIONAL (ENGLISH)

globe wireframe
magnifying glass
Tekla logo

Productscaret icon

Tekla Structures skip iconTekla Model Sharing skip iconTekla Structural Designer skip iconTekla Tedds skip iconTekla PowerFab skip iconTrimble Connect skip iconAll products skip icon

Solutions downward-facing caret

Designright caret

Constructible modeling skip iconConceptual design skip iconStructural analysis & design skip iconDesign communication skip iconConnected design skip icon

Detailright caret

Constructible detailing skip iconConstruction documentation skip icon

Fabricateright caret

Production planning & management skip iconAutomated production skip iconConnected project delivery skip icon

Constructright caret

Bid & win skip iconSite planning & coordination skip iconConnected worksite skip icon

Educateright caret

Tekla Campus skip iconTekla for students skip iconTekla for educators skip iconTekla for academic institutions skip iconTrimble student ambassador program skip icon

All solutions

Resourcescaret icon

Articles & blog posts skip iconReferences skip iconWebinars skip iconNews skip iconEvents skip iconeBooks skip iconTekla BIM Awards skip iconAll resources skip icon

Supportcaret icon

Tekla User Assistance skip iconTrimble Downloads skip iconTekla Discussion Forum skip iconTekla Warehouse skip iconTekla Developer Center skip iconTraining skip iconAll support skip icon

Aboutcaret icon

Why Tekla & Trimble skip iconContact us skip iconCareers skip iconTekla Trust Center skip iconLicense compliance skip iconAll about skip icon

| INTERNATIONAL (ENGLISH)

globe wireframe icon

Productscaret icon

  • Tekla Structures
  • Tekla Model Sharing
  • Tekla Structural Designer
  • Tekla Tedds
  • Tekla PowerFab
  • Trimble Connect
  • All products

Solutionscaret icon

Designcaret icon

  • Constructible modeling
  • Conceptual design
  • Structural analysis & design
  • Design communication
  • Connected design

Detailcaret icon

  • Constructible detailing
  • Construction documentation

Fabricatecaret icon

  • Production planning & management
  • Automated production
  • Connected project delivery

Constructcaret icon

  • Bid & win
  • Site planning & coordination
  • Connected worksite

Educatecaret icon

  • Tekla Campus
  • Tekla for students
  • Tekla for educators
  • Tekla for academic institutions
  • Trimble student ambassador program
All solutions

Resourcescaret icon

  • Articles & blog posts
  • References
  • Webinars
  • News
  • Events
  • eBooks
  • Tekla BIM Awards
  • All resources

Supportcaret icon

  • Tekla User Assistance
  • Trimble Downloads
  • Tekla Discussion Forum
  • Tekla Warehouse
  • Tekla Developer Center
  • Training
  • All support

Aboutcaret icon

  • Why Tekla & Trimble
  • Contact us
  • Careers
  • Tekla Trust Center
  • License compliance
  • All about
  1. Home
  2. Tekla BIM Awards
  3. Motorway construction Vt4 Kirri-Tikkakoski
CONTACT US