Karavaanikuja 2-4

About the project

Project category

Commercial

Company / Project parties

Projektitiimi Karavaanikuja 2-4

Location

Finland

Images

placeholder imageplay button

Karavaanikuja 2-4

BIM helped reach an understanding with the city planning committee

Despite a challenging outset, information flowed, and cooperation succeeded between the participants of this apartment block project that was extensively modeled. The project was technically demanding and located in a tight plot that required detailed modeling in advance. Helsinki city plan update allowed building attractive, well-connected apartments near a metro station.

The project consists of three apartment blocks located in one block divided between two condominiums. The buildings encompass 5 to 9 floors. They share one parking garage in the basement, retail space on the ground floor, and dwellings on all other above-ground floors. The bathrooms are prefabricated units. The buildings stand on bored piles and ground slabs. The structures mainly consist of prefabricated units. The facade features colored concrete and brick tiles. Part of the upper ceiling is wooden and slanted, another part is flat and made of lightweight aggregate.

BIM played a central role in the project from zoning to construction. The software tools were used extensively in every phase of the project, sometimes stretching the limits of their performance. Modeling the designs added cooperation and visuality in the project. Modeling helped understand the elements of the project, supported the decision-making, and became an important tool in production planning and implementation. Rich building information has been utilized in project development, procurement, and facility management. 98% of the cost items were calculated based on the model, and thanks to its rich data content, procurement could mainly rely on the model. BIM enabled a lean data flow: the right information at the right time in the right place for the right purpose.

Innovation would have been missed without modeling

BIM enabled co-innovating necessary construction and engineering techniques. The city plan required a brick facade that would have been expensive to lay on-site. BIM is an important part of the Big Room method developed by Fira that was used together with the architect, Fira and precast fabricator to create a brick-tile facade element with decorative surface. BIM played an important role in coming to terms with the city planning committee.

Successful design of the parking lot turned out crucial for the project. The parking area was fitted in the block to serve different types of cars and drivers. By co-developing technical solutions, the project team was able to create 49 m2 of extra space for the residents. Smaller apartments now have a good 0.5 m2 of extra space in the most critical locations.  A-Insinöörit modeled the geometry of the structures and the reinforcement types according to the project
owner’s requirements for accuracy in the structural design phase. In the detailing phase, the building units were modeled including every reinforcing bar and formwork item. Most of the CIP structures were modeled, and the structures designed in 2D were complemented by modeling the correct geometry and connections as well as reinforcement types. Wooden structures on the rooftop were modeled to match the geometry and locations, which meant that also the slanted parts and outlets were modeled to their locations. All of the steel structures were modeled and placed into assembly plans. Drain and radon pipes, chimneys and non-load-bearing walls were modeled according to as-built geometry.

This project was the first to utilize Tekla Model Sharing at A-Insinöörit. People got used to the new way of working quickly, and it was easier to access the old versions and save the local model so that the project data was kept up to date. Design statuses were published in the shared model. General contractor was able to access the model personally to review status and other necessary details. This allowed the structural designer to use their resources in the actual design. By using the BIM Publisher tool in Tekla Structures, the IFC model was published during the night, not during valuable working hours. The hole reservation tool made it easier and faster to check penetrations and details that required special attention. In addition to Tekla basic numbering, the units and assemblies were identified by ACN that sorted identical units into order.

It was clear since the beginning that BIM would be used in the project. It was modeled 100%, and in the production planning phase BIM utilization brought clear benefits. The models have become daily tools on-site. New tools and ways of working have been applied during the project, for example, modeling was utilized to design the work for a demanding CIP beam and to negotiate subcontracting to provide a clear visualization of the intended end result. On-site, the supervisors and subcontractors used Tekla Field3D mobile application to understand the demanding reinforcements needed for the air-raid shelter, for example. It was easy to extract the quantities for concrete and formwork from the model. Reinforcing steel for civil defense shelters was modeled per geometry and data according to Celsa Steel Service’s requirements so that the reinforcing bars could be fabricated based on the structural model. The site received an IFC model of all reinforcements modeled and delivered so that they could verify the contents and fabrication status of the deliveries with an application provided by Celsa. Compared to a traditional reinforcement process, modeling reduced the lead time from order to delivery by 20 to 30 %, which reduced scheduling pressure and the risk of errors. A tool developed by Parma was utilized in hollow-core slab production. It allowed visualizing the manufacturing status in real time and controlling it according to design and on-site situations. This project was a pilot for Fira’s 5D production management system that carries the quantity, cost and scheduling information seamlessly throughout the construction project.

Project parties

Owner: Kojamo Oyj (Karavaanikuja 2)

Owner: Asuntosäätiö SR (Karavaanikuja 4)

General contractor: Fira Oy

Architect: Arkkitehtitoimisto Konkret Oy

Structural design: A-Insinöörit Oy

HVAC design: Climaconsult Finland Oy

Electrical design: Sähköinsinööritoimisto J Mannonen Oy

Geotechnical design: Geotek Oy, A-Insinöörit Oy

Precast fabrication: NB-Seinä Oy, Parma Oy, Betonimestarit Oy

Prefabricated sanitary unit: Parmarine Oy

Elevators: Schindler Oy

Steel fabrication: RM-Hitsaamo Oy

Rebar fabrication: Celsa Steel Service Oy

Tekla BIM Awards

The Tekla BIM Awards honor projects that transform the way the world builds.

See all projects

The Content on this page is provided to Trimble Solutions Corporation ("Trimble") under the Tekla Global BIM Awards Terms and Conditions.

Trimble Logo

INTERNATIONAL (ENGLISH)

globe wireframe
magnifying glass
Tekla logo

Productscaret icon

Tekla Structures skip iconTekla Model Sharing skip iconTekla Structural Designer skip iconTekla Tedds skip iconTekla PowerFab skip iconTrimble Connect skip iconAll products skip icon

Solutions downward-facing caret

Designright caret

Constructible modeling skip iconConceptual design skip iconStructural analysis & design skip iconDesign communication skip iconConnected design skip icon

Detailright caret

Constructible detailing skip iconConstruction documentation skip icon

Fabricateright caret

Production planning & management skip iconAutomated production skip iconConnected project delivery skip icon

Constructright caret

Bid & win skip iconSite planning & coordination skip iconConnected worksite skip icon

Educateright caret

Tekla Campus skip iconTekla for students skip iconTekla for educators skip iconTekla for academic institutions skip iconTrimble student ambassador program skip icon

All solutions

Resourcescaret icon

Articles & blog posts skip iconReferences skip iconWebinars skip iconNews skip iconEvents skip iconeBooks skip iconTekla BIM Awards skip iconAll resources skip icon

Supportcaret icon

Tekla User Assistance skip iconTrimble Downloads skip iconTekla Discussion Forum skip iconTekla Warehouse skip iconTekla Developer Center skip iconTraining skip iconAll support skip icon

Aboutcaret icon

Why Tekla & Trimble skip iconContact us skip iconCareers skip iconTekla Trust Center skip iconLicense compliance skip iconAll about skip icon

| INTERNATIONAL (ENGLISH)

globe wireframe icon

Productscaret icon

  • Tekla Structures
  • Tekla Model Sharing
  • Tekla Structural Designer
  • Tekla Tedds
  • Tekla PowerFab
  • Trimble Connect
  • All products

Solutionscaret icon

Designcaret icon

  • Constructible modeling
  • Conceptual design
  • Structural analysis & design
  • Design communication
  • Connected design

Detailcaret icon

  • Constructible detailing
  • Construction documentation

Fabricatecaret icon

  • Production planning & management
  • Automated production
  • Connected project delivery

Constructcaret icon

  • Bid & win
  • Site planning & coordination
  • Connected worksite

Educatecaret icon

  • Tekla Campus
  • Tekla for students
  • Tekla for educators
  • Tekla for academic institutions
  • Trimble student ambassador program
All solutions

Resourcescaret icon

  • Articles & blog posts
  • References
  • Webinars
  • News
  • Events
  • eBooks
  • Tekla BIM Awards
  • All resources

Supportcaret icon

  • Tekla User Assistance
  • Trimble Downloads
  • Tekla Discussion Forum
  • Tekla Warehouse
  • Tekla Developer Center
  • Training
  • All support

Aboutcaret icon

  • Why Tekla & Trimble
  • Contact us
  • Careers
  • Tekla Trust Center
  • License compliance
  • All about
  1. Home
  2. Tekla BIM Awards
  3. Karavaanikuja 2-4
CONTACT US