Project description
The subject of the project is the design of steel structures of the warehouse and other buildings serving for the storage of alternative fuels based on waste in the cement industry in Burglengenfeld. A bridge crane is located in the storage hall, and the hall property with the storage warehouse is cladded in the inside to prevent the dust from being deposited on the steel structures. The bridge crane operates in automated, cyclical and continuous mode. Access to the crane track is via the staircase. Part of this is the design of an angle tower, a filter support, a bridge crane, and a screening object. The entire construction is galvanized. When designing the construction, it was necessary to take into account the division of the construction for galvanization and transport to the construction site. The model was processed in synergy with technology, in DWG, STP file extensions. The whole project was exceptional through the cooperation of steel structures, concrete structures, technologies and investor requirements in four European countries.
Â