Project description
The project is a state-of-the-art sports facility with a free height of 12.5 m which is required for international volleyball competitions. The hall is also equipped with a grandstand so that the audience can attend the matches. Furthermore, the necessary accommodations are provided, including the required dressing rooms, but offices are also provided in the building.
It is striking that the national volleyball teams Yellow Tigers and Red Dragons will also use the new infrastructure. They will also train there. The lower floor is fully equipped as a parking area. The beams in the façade carry a steel blade system in the columns to meet the façade elements. The roof is equipped with IVH beams with a length of 39.8m.
The manufacturer of the reinforced concrete elements has continued to work in our 3D model so we have been able to detect and solve conflicts so that assembly can proceed smoothly.
Â