Home

  • Gain a Competitive Edge with Tekla Application Development

    Gain a Competitive Edge with Tekla Application Development

    Three detailing and engineering companies have chosen to stay ahead of the competition by providing software development services besides their Tekla design services.

    Read Article
  • Five Key Benefits of 3D Modeling in Pour Planning

    Five Key Benefits of 3D Modeling in Pour Planning

    Discover five reasons why concrete contractors should use 3D when planning pour.

    Read Article
  • Precast concrete and digital technology - Facilitators of the new normal

    Precast concrete and digital technology - Facilitators of the new normal

    How a combination of off-site construction and remote collaboration software tools could be the key to supporting and enabling this new, safer way of working.

    Read Article
  • ×

    FREE GUIDE to Better Performing Concrete Takeoffs

    First Name
    Last Name
    Company
    Country
    Yes, I give consent to receive marketing communications from the Tekla Resource Center.
    At Trimble, we are committed to your privacy and handle your information in accordance with our Privacy Policy
    Thank you!
    Error - something went wrong!
  • BIM: a Reality in the Precast Concrete Industry

    BIM: a Reality in the Precast Concrete Industry

    “Building information models are created in the beginning of the process, at the budget preparation phase, to present the project to the customer. This model is used throughout the project lifecycle."

    Read Article
  • Blominmäki Wastewater Treatment Plant: BIM Based Project Communications with Trimble Connect and Tekla Model Sharing

    Blominmäki Wastewater Treatment Plant: BIM Based Project Communications with Trimble Connect and Tekla Model Sharing

    Trimble's collaboration platforms managed this multi-material project with a huge amount of data, and they were widely used in the daily work of the different project teams.

    Read Article
  • Integration and Digitalization of Precast Concrete Process: from Design to Construction

    Integration and Digitalization of Precast Concrete Process: from Design to Construction

    Yunwoo PCE was keen to adopt BIM to overcome the issues of existing 2D CAD design methods. They chose Tekla Structures to speed up workflow, reduce errors and achieve smoother collaboration.

    Read Article
  • 6 Things to Consider Before Buying BIM Software

    6 Things to Consider Before Buying BIM Software

    Your checklist for choosing your Building Information Modeling solution.

    Read Article
  • Saga Natatorium: The Earthquake-Resistant Swim Stadium

    Saga Natatorium: The Earthquake-Resistant Swim Stadium

    The Saga Natatorium is a competition swimming stadium in Japan. Its earthquake-resistant steel frame was designed by DAIZO Engineering using Tekla software.

    Read Article
  • Meet and Collaborate with Tekla Users through Tekla Development Experts Page

    Meet and Collaborate with Tekla Users through Tekla Development Experts Page

    Do you have a great software solution or idea that you’re hoping to ship to the greater public? Join Tekla Development Experts and get together with talented programmers and Tekla users.

    Read Article
  • It's all about Pour: A Pour-focused Approach to Concrete Construction

    It's all about Pour: A Pour-focused Approach to Concrete Construction

    What does a Pour focused approach to concrete construction mean, and how DPR Construction streamlines the mobilization by using pour information from the beginning of the process.

    Read Article
  • ×

    GUIDE: How to stay competitive in precast concrete sales?

    First Name
    Last Name
    Company
    Country
    Yes, I give consent to receive marketing communications from the Tekla Resource Center.
    At Trimble, we are committed to your privacy and handle your information in accordance with our Privacy Policy
    Thank you!
    Error - something went wrong!
  • Randselva Bridge: Closing the Gap on Drawing-Free Design

    Randselva Bridge: Closing the Gap on Drawing-Free Design

    Randselva Bridge in Norway is the world’s longest bridge to be designed and constructed using only Bridge Information Modeling, and no traditional paper drawings.

    Read Article
  • Accuracy, Speed, and Enhanced Collaboration: The Structural Engineers' Joys of Using 3D Modeling

    Accuracy, Speed, and Enhanced Collaboration: The Structural Engineers' Joys of Using 3D Modeling

    How a Structural Engineer can benefit from using 3D modeling

    Read Article
  • A transmission tower – a true combination of art and engineering

    A transmission tower – a true combination of art and engineering

    The 2020 Tekla Global BIM Award for “Best Small Project” went to Russian steel design and manufacturing company Belenergomash for its work on a transmission tower with a unique look and feel.

    Read Article
  • Reinforcing the Construction Business Through Collaboration

    Reinforcing the Construction Business Through Collaboration

    Learn how to make the most of Tekla Structures and Trimble Connect by joining our new Rebar eLearning

    Read Article
  • The Bridge Hospital: How Concurrent Design and Construction Can Overcome a Tight Schedule

    The Bridge Hospital: How Concurrent Design and Construction Can Overcome a Tight Schedule

    The new Bridge Hospital represents the biggest construction project ever for Finland’s HUS Helsinki University Hospital. The project is the Public category winner of the Tekla Global BIM Awards 2020

    Read Article
  • How Tekla Structures is Easy to Use for Concrete Pour Planning and Execution

    How Tekla Structures is Easy to Use for Concrete Pour Planning and Execution

    Why Tekla Structures is the best 3D model software for concrete pour planning and execution

    Read Article
  • DPR Construction: Bidding with a Solid Plan by Engaging the Team and Creating an Accurate 3D Model.

    DPR Construction: Bidding with a Solid Plan by Engaging the Team and Creating an Accurate 3D Model.

    Using Tekla software helps DPR Construction win the projects with solid plans, engage their team, streamline the mobilization, and keep connected with all the relevant stakeholders

    Read Article
  • Three Methods for Fostering Communication with the Client

    Three Methods for Fostering Communication with the Client

    The lack of communication often ruins relationships with the customer. How can the fabricator create confidence and trust by open and proactive communication with the client?

    Read Article
  • Making Rebar Detailing an Ingredient of your Construction Project Overall Success

    Making Rebar Detailing an Ingredient of your Construction Project Overall Success

    How using a 3D model for rebar detailing plays a vital role in the whole construction process.

    Read Article
  • ×

    Steel Estimator's Guide to Staying Competitive

    First Name
    Last Name
    Company
    Country
    Yes, I give consent to receive communications from the Tekla Resource Center.
    At Trimble, we are committed to your privacy and handle your information in accordance with our Privacy Policy
    Thank you!
    Error - something went wrong!
  • One Nine Elms: a New London Landmark Built with Tekla

    One Nine Elms: a New London Landmark Built with Tekla

    London’s One Nine Elms development was named Best Commercial Project in the 2020 Tekla Global BIM Awards. The engineering team won praise for planning the rebar under challenging conditions.

    Read Article
  • loading
    Loading More...