S02C Arch Bridge – N22 Baile Bhuirne to Macroom Road Development

Banagher Precast used Tekla Structures and both on-site and off-site precast construction methods, to design and detail the S02C Arch Bridge in Ireland.

About the project

Project category

Infrastructure

Company

Banagher Precast Concrete Ltd.

Location

Cork, IE

Gallery

placeholder imageplay button

Model flythrough

Model view showing reinforcement

Model showing rebar

Rebar close-up

Bridge rebar close-up

Full model

Photo of bridge completion wearing course

Photo of sub base pavement works

Project in numbers

Precast elements

4x Precast Square Column (Long & Short) Cast together units (2 x MYE1 beams, slab, Parapet)

MY beams

60x MY beams - approx. 5.5 tonnes per unit

Trimble products used

Tekla Structures, Tekla Model Sharing, Trimble Connect

Reaching new heights with Tekla and Banagher Precast

The N22 Baile Bhuirne to Macroom project in County Cork was a significant infrastructure project, including the construction of 22 kilometres of dual carriageway. Valued at €280 million, it stands as one of Ireland's largest infrastructure projects to date. Among its notable features are the construction of 21 road bridges, including crossings over the Sullane, Laney, and Bohill rivers.

The S02C Combined Accommodation Overbridge, located on the AR07 Access Road north of the existing N22 in County Cork, is a key component of the N22 Scheme. This overbridge spans the N22 Macroom Bypass mainline within a deep rock cut, reaching a clearance of approximately 20 metres above the mainline level. It is characterised by its fully integral arch design, featuring discreet columns and a top deck. With a main arch spanning 44.0 metres and rising 8.0 metres, and approach spans of 8.2 metres on each side, the total deck length measures 64 metres.

What distinguishes this structure from others is both its aesthetics – it seamlessly blends with the surrounding landscape – as well as its innovative approach to utilising both on-site and off-site precast construction methods, the scale of which had not been previously seen in Ireland.

The S02C Combined Accommodation Overbridge project was completed in November 2023, marking a significant milestone in the N22 Baile Bhuirne to Macroom Bypass scheme, with the final section now open to the public.

 

Challenges and achievements

The Banagher Precast team undertook the entire design and detailing process for this project, using Tekla Structures to ensure there were no clashes during assembly, even at a height of 30 metres above ground level. The client was impressed by the team’s precision, and the installation proceeded seamlessly.

Tekla Structures played a crucial role in the S02C Combined Accommodation Overbridge project, enabling the Banagher Precast team to create detailed models and production drawings for all elements with utmost accuracy. Additionally, Trimble Connect was used to provide real-time visualisation of the elements on the factory floor, enhancing coordination and efficiency. The model was also shared with the client to facilitate the installation process and ensure alignment with their requirements.

 

Using Tekla software

Trimble Connect was used for visualisation of the full model on the factory floor. This process helped the Banagher Precast team to visualise elements being cast, and also spot inconsistencies and omissions, saving time in comparison to standard paper drawing methods.

UK Tekla Awards

The UK Tekla Awards honour projects that transform the way the world builds.

See all projects

The Content on this page is provided to Trimble Solutions Corporation ("Trimble") under the Tekla BIM Awards Terms and Conditions.

Trimble Logo

UK (ENGLISH)

globe wireframe
magnifying glass
Tekla logo

Productscaret icon

Tekla Structures skip iconTekla Model Sharing skip iconTekla PowerFab skip iconTekla Tedds skip iconTekla Structural Designer skip iconTekla Portal Frame Designer & Tekla Connection Designer skip iconTrimble Connect skip iconAll products skip icon

Solutions downward-facing caret

Designright caret

Constructible modeling skip iconConceptual design skip iconStructural analysis & design skip iconDesign communication skip iconConnected design skip icon

Detailright caret

Constructible detailing skip iconConstruction documentation skip icon

Fabricateright caret

Production planning & management skip iconAutomated production skip iconConnected project delivery skip icon

Constructright caret

Bid & win skip iconSite planning & coordination skip iconConnected worksite skip icon

Educateright caret

Tekla Campus skip iconTekla for students skip iconTekla for educators skip iconTekla for academic institutions skip icon

All solutions

Resourcescaret icon

Articles & blog posts skip iconReferences skip iconWebinars skip iconeBooks skip iconNews skip iconEvents skip iconTekla BIM Awards skip iconThe jobs board skip iconAll resources skip icon

Supportcaret icon

Trimble Downloads skip iconTekla Discussion Forum skip iconTekla User Assistance skip iconTekla Warehouse skip iconTekla Developer Center skip iconTraining skip iconAll support skip icon

Aboutcaret icon

Why Tekla & Trimble skip iconContact us skip iconCareers skip iconTekla Trust Center skip iconLicense compliance skip iconAll about skip icon

| UK (ENGLISH)

globe wireframe icon

Productscaret icon

  • Tekla Structures
  • Tekla Model Sharing
  • Tekla PowerFab
  • Tekla Tedds
  • Tekla Structural Designer
  • Tekla Portal Frame Designer & Tekla Connection Designer
  • Trimble Connect
  • All products

Solutionscaret icon

Designcaret icon

  • Constructible modeling
  • Conceptual design
  • Structural analysis & design
  • Design communication
  • Connected design

Detailcaret icon

  • Constructible detailing
  • Construction documentation

Fabricatecaret icon

  • Production planning & management
  • Automated production
  • Connected project delivery

Constructcaret icon

  • Bid & win
  • Site planning & coordination
  • Connected worksite

Educatecaret icon

  • Tekla Campus
  • Tekla for students
  • Tekla for educators
  • Tekla for academic institutions
All solutions

Resourcescaret icon

  • Articles & blog posts
  • References
  • Webinars
  • eBooks
  • News
  • Events
  • Tekla BIM Awards
  • The jobs board
  • All resources

Supportcaret icon

  • Trimble Downloads
  • Tekla Discussion Forum
  • Tekla User Assistance
  • Tekla Warehouse
  • Tekla Developer Center
  • Training
  • All support

Aboutcaret icon

  • Why Tekla & Trimble
  • Contact us
  • Careers
  • Tekla Trust Center
  • License compliance
  • All about
  1. Home
  2. Tekla BIM Awards
  3. S02C Arch Bridge – N22 Baile Bhuirne to Macroom Road Development
CONTACT US