Ascending to Greater Heights
Ascending to Greater Heights
Constructible technology pays dividends for Malaysian engineering firm.
The Tallest Building in SEA Built with Tekla and Trimble
The Tallest Building in SEA Built with Tekla and Trimble
Coteccons completes groundbreaking Landmark 81 skyscraper project – 45 days ahead of schedule
Bridge Design by WSP Finland
Bridge Design by WSP Finland
WSP Finland aims at advanced design methods for efficient and optimized steel and concrete bridge design. This is why they have chosen to utilize Tekla Structures’ 3D modeling properties in several bridge projects.
BlackSea-TORM
Students pushed BIM boundaries with BlackSea-TORM
Students pushed BIM boundaries with BlackSea-TORM
Creating a working locomotive with BIM
Creating a working locomotive with BIM
Who would come up with an idea of using BIM software for building a working replica of a locomotive? An experienced steel detailer, naturally!
Kainuu Hospital
Kainuu Hospital - the best example of deep BIM collaboration
The best picture of deep BIM collaboration
Luminary: Clash-free construction with model-based collaboration
Luminary: Clash-free construction with model-based collaboration
Luminary is a multiform high rise building with very strict tolerance demands. Success relates to model-based design and collaboration as well as sharing and utilizing model data on site.
How Hinkley Point C got a power-up with BIM
How Hinkley Point C got a power-up with BIM
Hinkley Point C is one of the largest construction projects in the world