Project of NBNT Water distribution station we were doing fabrications of 3nos. Ground storage tanks, 1no. Elevated storage reserver tank, piping, Pump room, Valve chambers & etc. are currently under construction. Completion is scheduled for approximately 2016. this project is approximately $11 million (NBNT only) & this water distribution station is a composite with steel and concrete framed structures. The structural design of this project is considerably more complex. Our team has been working together since 2014 to build a completely coordinated and constructable model that will eventually get passed onto the owner for facilities management use. Entire effort in exterior skin modeling from vendor shop drawings (2D) was to communicate the design in a 3D environment to convey issues back to the 2D detailers.