Skip to main content

How Trimble Connect helped build Hinkley Point C

Watch as Tim Davies explains how Trimble Connect was used during the construction phase of Hinkley Point C, providing teams on the ground with up-to-minute models in both the 3D and 2D space. Hinkley Point C is one of the biggest and most complex projects currently under construction in Europe, with BYLOR - the joint venture between Bouygues Travaux Publics (TP) and Laing O'Rourke - responsible for delivering the buildings that will house the two new nuclear reactors. Hinkley Point C is the first new nuclear power station to be built in the UK in over 20 years. A range of Trimble products have been present throughout this nuclear power plant project, through the design process with Tekla, construction process with Trimble Connect, and progress reports, records and data traceability with Viewpoint Field View. A full case study video is available to watch on https://www.youtube.com/watch?v=rJA7cjMKgnQ Learn more about Trimble software solutions: Trimble Connect: https://connect.trimble.com/ Tekla Structures: https://www.tekla.com/uk/products/tekla-structures Viewpoint Field View: https://www.viewpoint.com/en-gb/products/viewpoint-field-view Subscribe to our channel: https://www.youtube.com/user/TeklaStructures?sub_confirmation=1 Follow us on social media: LinkedIn: https://www.linkedin.com/showcase/trimble-tekla-uk Facebook: https://www.facebook.com/tekla.structures.uk Twitter: https://twitter.com/Trimble_TeklaUK