Skip to main content

Clear Collaboration Fast-Tracks Georgia Tech Football Facility Construction

With Tekla Structures, Barton Malow was able to quickly review and make changes to the 3D model, allowing them to finish their project ahead of schedule.

Download PDF

Before implementing BIM software into their workflows, the team at Barton Malow routinely used non-integrated design-to-manufacturing processes, which extended timelines due to paper-based or PDF reviews and delayed necessary communications. By making the switch to using Tekla Structures as their BIM software, they were able to easily review and make changes directly to the design in the model, reducing on-site issues.