8 tallet Oltmanns partner

8-tallet by Oltmanns und Partner

8-tallet by Oltmanns und Partner

One of Tekla’s long-term customers in Germany, engineering office Oltmanns und Partner GmbH of Oldenburg, has planned another project that combines ambitious architecture with functionality.
Tekla Structures

Cité Rotterdam

Cité Rotterdam

Fast changes, high quality: Cité Rotterdam

The Cité within the Kop van Zuid business area has had to deal with many changes during its design and construction. Modeling the thousands of parts and panels of the housing complex in 3D helped engineering office Meijer&Joustra to tackle their timeline.
Tekla Structures

Eagle Ridge residential development

Eagle Ridge residential development

Eagle Ridge Residential Development

Eagle Ridge Residential Development in Alberta, Canada, is a design-to-fabrication precast concrete project carried out completely within Tekla Structures 3D modeling software.
Tekla Structures

Telenor Arena Contiga

Telenor Arena by Contiga

Telenor Arena by Contiga

Norway-based Contiga is one of the leading suppliers of prefabricated concrete and steel solutions in Scandinavia.Telenor Arena in Fornebu, Norway, designed using Tekla Structures, represents one of their most recent successes.
Tekla Structures

IV-Consult

IV-Consult Offshore

IV-Consult

IV-Consult offshore oil platforms design and detailing
Tekla Structures

PGE Arena Gdansk

PGE Arena in Gdansk

PGE Arena in Gdansk

The PGE Arena Gdansk is architecturally one of the most interesting venues to host the eagerly anticipated UEFA Euro 2012. It is also a new landmark for the city of Gdansk in Poland.
Tekla Structures

Panorama Tower

Panorama Tower

Panorama Tower

The Panorama Tower construction site was located in the middle of an existing commercial center in Espoo, Finland, and was therefore a challenging project for logistics alone.
Tekla Structures

Swansea's Port Tawe Sail Bridge

Swansea's Port Tawe Sail Bridge

Swansea's Port Tawe Sail Bridge

The Swansea Sail Bridge connects the city center with the Swansea Docks regeneration project to the east of the city. With the help of Tekla Structures software the project from design through to construction was completed in less than 15 months.
Tekla Structures

Pages