Temporary Works Engineer
The efficient design, installation and management of temporary works improves overall project delivery.
-
The relationship between BIM and Formwork
The importance of considering formwork and other temporary works alongside permanent works and how BIM can help.
-
Boeing hangar proves sky is the limit for Tekla
With over 3000 tonnes of structural steelwork the challenges of designing and building this vast aircraft hanger were overcome using Tekla Structural Designer and Tekla Structures.
-
BIM fundamental to delivery of the new Luton DART
Railway stations are often challenging, especially when underground, but Tekla Structures helped Hewson Structural Engineers with this complex project.
-
Delivering in offshore energy
Decommissioning gas platforms is not a common application for Tekla Structures, but it is still up to the job.
-
29:04
Tekla Structural Designer for Foundations
All aspects of foundation design, such as pad bases, pile cap columns and foundation mats are considered when designing with Tekla Structural Designer.
-
Aligning temporary works with the digital plan of works
Understand the benefits of incorporating digital temporary works processes on a project.
-
Tekla Tedds review - An overlooked essential
David Chadwick from Construction Computing magazine reviews Tekla Tedds and its essential, easy to use structural and civil engineering calculations.
-
Slab deflections made easy with Tekla Structural Designer
Over 5000 tonnes of rebar were used to create this three storey basement using a top down approach. Tekla Structures was used to design the RC detailing for the reinforced concrete elements.
-
31:36
Specialized Analysis Considerations for Concrete Structures
How do you decide the methodology of the geometry, decomposition, analysis and design? It’s important that your software considers all possible outcomes.
-
Prestigious Knightsbridge Façade supported, thanks to Tekla Structural Designer
A combination of Tekla Structural Designer and Tekla Structures helps production of coordinated construction information and drawings for temporary works, retained structures and permanent works.
-
Bridging the gap from design to installation with Tekla Structures
A new footbridge bridge that spans two dual carrigeways and a live railway line - this project threw up many challenges. Read more to find out how Tekla Structures helped SH Structures to success.
-
Demonstrating the power of Tekla on the South Korean power plant
How did the design of Asia's largest biomass power plant deal with over 60,000 steel elements in just the new boiler islands fabric filter?
-
Loading More...