How the Museum of the Future is stretching the limits of structural engineering
How the Museum of the Future is stretching the limits of structural engineering
The iconic Museum of the Future will serve as an exhibition space for innovative and futuristic concepts, services and products. The impressive project by steel fabricator Eversendai L.L.C. cleaned up the table in Tekla Global BIM Awards 2018.
Finnforest Modular Office
Finnforest Modular Office
Finnforest Modular Office (FMO) in Tapiola, Finland, was detailed and built utilizing Tekla’s advanced 3D design and modeling technique.
Chenab Bridge soars through construction process thanks to BrIM
Chenab Bridge soars through construction process thanks to BrIM
Chenab Bridge, located in northern India, is being constructed as part of the new Baramulla – Srinagar – Udhamptur railway and is one of the highest (by deck height) and longest-spanning railway bridges of its type in the world.
High LOD scores best in complex structures - Mordovia Arena, RUS
Mordovia Arena with unique structures accurately delivered for World Cup 2018
The choice of software plays a decisive role in the implementation of a project. In complex structures maximum accuracy is important at all stages.
Grandfather's Bridge - Working Efficiently and Improving Quality with BIM
Grandfather's Bridge - Working Efficiently and Improving Quality with BIM
The Grandfather´s Bridge is a fullblown BIM project from call for bids to public opening and beyond
Tripla: BIM from laser scanning to structures and presenting offices
Tripla: BIM from laser scanning to structures and virtual presentation of offices
"In a way, we have many separate construction sites here: the parking, shopping center, station, apartments, office blocks, and hotel. Although they are separate, all Building Information Models use the same coordinate system and are compatible."
Celsa Steel Service Focuses on the Total Cost of Reinforcement
Celsa Steel Service Focuses on the Total Cost of Reinforcement
In order to achieve more cost effective processes and services, cut costly waste and add value for the customers, Celsa decided to shift focus on total cost of reinforcement including assembly and logistics. For this purpose, Celsa chose BIM.
Song Da 5 JSC: Benefitting from BIM adoption
Song Da 5 JSC: Benefitting from BIM Adoption
A well-established Vietnamese construction company uses Tekla software to improve productivity and successfully deliver this highly specialized hydropower plant project. The project went on to achieve first place in the 2016 Tekla Asia BIM Award.