Biomass Power Plant, South Korea

Demonstrating the power of Tekla - South Korean power plant

Demonstrating the power of Tekla on the South Chungcheong province, South Korean power plant.

Breaking records as Asia’s largest biomass power plant facility, the project presented TDS with a significant challenge – mainly the designing and modelling of all 66,011 steel elements!
Tekla Model Sharing Tekla Structures

One Nine Elm, London

One Nine Elms - 5,800 tonnes of rebar and a software solution

One Nine Elms - 5,800 tonnes of rebar and a software solution

The landmark One Nine Elms project, with its sub-structure’s challenging top-down construction and over 5000 tonnes of rebar required, Solve Structural Design Ltd turned to Trimble’s Tekla Structures.
Tekla Structures Trimble Connect

Water Street Bridge

Kilnbridge - Bridging the gap between precast and cast-in-place

Kilnbridge - Bridging the gap between precast and cast-in-place

A hybrid mix of precast, cast-in-place and reinforcement concrete, a tight delivery schedule, a marine environment and complex construction methodologies - Kilnbridge Construction Services turned to Trimble’s Tekla Structures
Tekla Structures

Soilbuild - Leading the way in building more efficiently and intelligently

Soilbuild - Leading the way in building more efficiently and intelligently

One of Singapore’s most established builders, is at the forefront of embracing Integrated Digital Delivery in building a robust Design for Manufacture and Assembly (DfMA) ecosystem.
Tekla Structures

Bridging the gap from design to installation with Tekla Structures

Bridging the gap from design to installation with Tekla Structures

Telford Central Footbridge project is an excellent example of a collaborative approach to construction, with Trimble’s Tekla Structures software playing an important part in the process.
Tekla Structures

O’Reilly - Saving time and money

O’Reilly - Saving time and money

High quality precast solutions faster with Tekla software. Tekla Structures is a very clever piece of software, as you can view the future development in a 3D model and identify and correct all design clashes.
Tekla Structural Designer Tekla Structures Tekla Tedds

Formwork Modelling with DPR Construction

Formwork Modelling with DPR Construction

With Tekla formwork modeling we were able to rapidly try out various formwork options enabling us to choose the arrangement that worked best with regards to cost and constructibility.
Tekla Structures

Landmark 81

The tallest building in SEA built with Tekla and Trimble

The tallest building in SEA built with Tekla and Trimble

Coteccons completes groundbreaking Landmark 81 skyscraper project – 45 days ahead of schedule.
Tekla Structures Trimble Connect

Pages