Icarus LSF worked alongside Interserve Construction to design and install this Loading Bearing Scheme ‘PPI Northumbria Cancer Care’, this building would be one of the first in the North East to offer new treatment for cancer patients.
One of the main aspects of this building was the time constraints which applied to the whole project. Due to having a strict timescale it was highly important Icarus where able to design the building within Tekla incorporating different trades within the design. Due to the complexity of the project, it was separated into five different phases, this was to ensure all aspects had been incorporated and allowed deliveries to start on phases which had been designed, manufactured and ready for install.
The scheme needed a building solution that would deliver both pace and innovation, therefore Interserve Construction approached Icarus LSF to design, manufacture and construct the building using off-site manufactured light steel frame (LSF) technology.