Coteccons completes groundbreaking Landmark 81 skyscraper project – 45 days ahead of schedule
Tekla Structures Trimble Connect

Oostingh Staalbouw

How to keep models always up-to-date?

At Oostingh Staalbouw, information is always up-to-date

To keep every part of each project up-to-date, Oostingh Staalbouw Katwijk, a Dutch steel construction company, chose Tekla Model Sharing.
Tekla Model Sharing

The structural model of Bergen Airport

Aas-Jakobsen finds new ways of working with Tekla Model Sharing

Aas-Jakobsen Finds New Ways of Working with Tekla Model Sharing

When Aas-Jakobsen got overwhelmed with work with two large airport projects, good tools were needed.
Tekla Model Sharing Tekla Structures

Tekla Model Sharing and DNA Detailing & BIM in Hawaii

Tekla Model Sharing Makes a Dream Lifestyle Possible for DNA Detailing

Tekla Model Sharing Makes a Dream Lifestyle Possible

With Tekla Model Sharing, you can work on Tekla Structures models together with others regardless of your location or time zone. That is what DNA Detailing & BIM, LLC does.
Tekla Model Sharing

Gardens at the Bay

Gardens at the Bay

Gardens at the Bay

Gardens by the Bay will have conservatories that will bring in plants native to more temperate climates as well as themed gardens that explore the different cultural traditions that make up Singapore.
Tekla Structures

Busan Cinema Center

Busan Cinema Center

Busan Cinema Center is a landmark feature of Busan and is a dedicated theatre for the BIFF (Busan International Film Festival), which is one of the top film festivals in Asia.
Tekla Structures

Tokyo Sky Tree

Tokyo Sky Tree

Tokyo Sky Tree สูงถึง 634 เมตร

634 meters high Tokyo Sky Tree is the world’s tallest free-standing tower for digital terrestrial broadcasting. Japanese traditional sense of beauty and state-of-the-art engineering have been integrated to its design.
Tekla Structures

Optus Stadium BIM power

Optus Stadium: Agile BIM project completed ahead of schedule

Optus Stadium:โครงการก่อสร้างระบบ BIM ที่เสร็จสมบูรณ์ก่อนกำหนด

Optus Stadium development project was completed three weeks ahead of schedule. The project is the winner of the Best Sports & Recreation category of Tekla Global BIM Awards 2018.
Tekla Model Sharing Tekla Structures