The Katz Residence was a unique and challenging project. It consists of 3 Casitas and a main structure. The design required rolled and sweeping beams with rolled and sweeping plates at the exterior of the building. The plates were rolled on the plan, and also changed in elevation. All plates throughout were sweeping. The steel ties into concrete, and has wood covering.
Most Recent Videos

This project is a new hotel and airport commuter train station for access to the airport by train from downtown Denver.

Syracuse University’s Ensley Athletic Center is a stand out facility that enhances its football team’s ability to practice, train and recruit new players.

This modularized industrial project was a true showcase of integrated BIM from design through fabrication.

Using Tekla Structures, we were able to eliminate redundant modeling efforts, streamline communication with the detailer/fabricator located in China and drastically reduce design discrepancies.

Jack Trice Stadium Improvements Phase 3 bowls in the South End Zone. This work included replacement of the 2,918 south end zone bleacher seats and 6,000 hillside seats with 13,330 permanent upper.

Thornton Tomasetti provided structural design, building skin and construction support services—which included consulting on building envelope systems and a fully detailed Tekla model.

The automated warehouse solution picks, packs and palletizes multi SKU pallets for individual grocery store distribution for the southeast US.

Prodraft, Inc.'s River Spirit Casino Expansion, Phase II positioned along the Tulsa Oklahoma Riverfront is going to have a laid back, island feel. “Jimmy Buffet’s Margaritaville Casino”.

MV-22 New River Aviation Complex is located in Jacksonville, North Carolina.

This bridge is a four lane single span bulb tee bridge with a span length of 119'. The structure was designed as total precast from the footings to the bridge deck.

Pankow Builder's 270 Brannan Street is a 202,000 gross square foot, Class A office building in the center of San Francisco’s SOMA district developed by SKS Investments.

Tekla Structures was used in a project to replace a BNSF 90’-0” movable railroad swing span over the Bayou Des Allemands in the state of Louisiana.

Model collaboration allowed multiple parties to be involved during the bid, design, fabrication, erection and bridge closure phases of the project.

NMI Industrial was contracted by Whiting-Turner in 2015 to design, build, and install a new series of conveyors for a new almond storage warehouse for Blue Diamond Growers in Salida, CA.

Meva's Multi-lift formwork for clarifier structure at the Gribben Tailings Basin Project in Palmer Michigan.

Check out the city hyde park BIM Award entry.

A central feature of this building was the monumental stair, a steel stair with under-slung stringers, steel plate sub-treads, and terazzo treads. T

The utilization of Tekla Structures through not only our detailing efforts, but that of the Structural Engineer – HGA Architectural & Engineering (HGA) proved to be a path to success.

Using Tekla makes layoing out odd shapes much easier and using BIM, Lucas Corporation was able to let the engineer and fabricator review the hopper configurations prior to completing them.

Check out the 500 Walnut BIM Award entry.