Doing it right first time

Doing it right first time: Early clash detection at the Commonwealth Games Athletes Village

Early clash detection at the Commonwealth Games Athletes Village, Gold Coast in Australia..
Tekla Structures

Holmes Consulting benefits from digital construction technology and 3D models

Holmes Consulting benefits from digital construction technology and 3D models

Tekla Global BIM Awards winner showcases 3D point clouds and clever use of BIM in an earthquake prone area
Tekla Structures

Arup Ove

Project OVE: Arup’s 170-meter-tall BIM man

Project OVE: Arup’s 170-meter-tall BIM man

OVE is a virtual representation of the human body created with BIM software and processes. Standing 170 meters tall, OVE breathes, sweats, gets hungry and has a heart. OVE’s skeleton was modeled with Tekla Structures.
Tekla Structures

Panorama Tower

Panorama Tower

Panorama Tower

The Panorama Tower construction site was located in the middle of an existing commercial center in Espoo, Finland, and was therefore a challenging project for logistics alone.
Tekla Structures

KGS Manitoba Hydro Spillway

KGS Group benefited from modeling Cast in Place with Tekla

KGS Group Benefited from Modeling Cast in Place with Tekla from the Very Beginning

KGS Group benefited from modeling Cast in Place with Tekla from the very beginning
Tekla Structures