Doing it right first time
Doing it right first time: Early clash detection at the Commonwealth Games Athletes Village
Early clash detection at the Commonwealth Games Athletes Village, Gold Coast in Australia..
Holmes Consulting benefits from digital construction technology and 3D models
Holmes Consulting benefits from digital construction technology and 3D models
Tekla Global BIM Awards winner showcases 3D point clouds and clever use of BIM in an earthquake prone area
Project OVE: Arup’s 170-meter-tall BIM man
Project OVE: Arup’s 170-meter-tall BIM man
OVE is a virtual representation of the human body created with BIM software and processes. Standing 170 meters tall, OVE breathes, sweats, gets hungry and has a heart. OVE’s skeleton was modeled with Tekla Structures.
Panorama Tower
Panorama Tower
The Panorama Tower construction site was located in the middle of an existing commercial center in Espoo, Finland, and was therefore a challenging project for logistics alone.
KGS Group benefited from modeling Cast in Place with Tekla
KGS Group Benefited from Modeling Cast in Place with Tekla from the Very Beginning
KGS Group benefited from modeling Cast in Place with Tekla from the very beginning