Tekla Structures helps gain significant efficiency in Combined Cycle Power Proje
Tekla Structures helps gain significant efficiency in Combined Cycle Power Project
Seizing the opportunity by overcoming challenges
The Tallest Building in SEA Built with Tekla and Trimble
The Tallest Building in SEA Built with Tekla and Trimble
Coteccons completes groundbreaking Landmark 81 skyscraper project – 45 days ahead of schedule
BrIM chasing new highs in India - Chenab Bridge
BrIM chasing new highs in India
Chenab Bridge is part of the new Baramulla—Srinagar—Udhamptur railway in northern India, crossing the river Chenab in the Kashmir valley. It is one of the tallest and longest-spanning railway bridges of its kind in the world.
Bridge Design by WSP Finland
Bridge Design by WSP Finland
WSP Finland aims at advanced design methods for efficient and optimized steel and concrete bridge design. This is why they have chosen to utilize Tekla Structures’ 3D modeling properties in several bridge projects.
The Singapore Sports Hub
The Singapore Sports Hub
Designing a national icon and the world's largest free spanning dome structure by Tekla solution.
PTDC Logistics Center
PTDC Logistics Center
The winner of the commercial project category at the 2015 Tekla Global BIM Awards
How to keep models always up-to-date?
At Oostingh Staalbouw, Information is Always Up-to-date
To keep every part of each project up-to-date, Oostingh Staalbouw Katwijk, a Dutch steel construction company, chose Tekla Model Sharing.
Project OVE: Arup’s 170-meter-tall BIM man
Project OVE: Arup’s 170-meter-tall BIM man
OVE is a virtual representation of the human body created with BIM software and processes. Standing 170 meters tall, OVE breathes, sweats, gets hungry and has a heart. OVE’s skeleton was modeled with Tekla Structures.