Project Scope:
Transportation of coal from Bhubaneswari Ocp to Silo (10 Mty) near Spur Siding III bypassing Jagannath Washery and to miscellaneous Customers (15 Mty) at Jagannath area.
Advantages of having utilized Tekla Structures:
- Design visualization
- Reduction of Errors
- Collision Detection
- Quantity Take Off
- Preparation of GA, FAB drawingsÂ
Â
Conclusion:
It provides an accurate, dynamic, and data-rich 3D environment that can be shared by all project parties. The very detailed as-built models enable the highest level of constructability and production control.Â
Centralizing data into the model allows for more collaborative and integrated project management and delivery that translates into increased productivity and elimination of waste.