Old Mangere Bridge replacement

A new and improved walking and cycling connection

About the project

Project category

Infrastructure

Company

Construct n3D Ltd

Location

New Zealand

Images

Project in numbers

Total Project Cost

$38 Million

Steelwork

510 tonnes

Trimble products used

Tekla Structures

Restoring a Community Landmark: The Old Māngere Bridge Replacement

Nestled amidst the vibrant cityscape of Auckland, New Zealand, the Old Mangere Bridge stood as a cherished symbol of community connectivity for over a century. However, time and wear had taken their toll, necessitating the replacement of this beloved landmark. Waka Kotahi NZ Transport Agency embarked on an ambitious project to create a new and improved walking and cycling connection that would honor the bridge’s legacy while establishing a new iconic landmark for the area.  Construct n3D completed the steel fabrication shop drawings and coordinated much of the onsite works with the benefit of a live asbuilt 3D model.

Technical Triumphs Amidst Complex Challenges

The project presented a unique set of challenges due to the scale and complexity of the geometry. The arch, with its variable geometry and deck cambering, demanded meticulous planning and execution. The coordination of in-situ concrete piers, precast panels, and balustrades into the steelwork aesthetic required exceptional precision.

The team meticulously planned the lifting of the steelwork over water to avoid interference with nearby transmission lines. Ensuring the precise alignment of all arch segments was crucial, as any discrepancies could compromise the structural integrity of the bridge. Point cloud scanning technology was employed to verify the lengths of the segments, ensuring their ability to form the arch seamlessly.

A Symbol of Resilience and Community Spirit

The project’s total cost amounted to $38 million, utilising 510 tonnes of steelwork, including balustrades, for the 60m-long radial deck. The arch, standing 12m high, boasts a variable trapezoidal profile of 2.2m wide x 0.8m high at the apex. Eighteen individual deck units were fabricated into transportable modules, delivered from Napier to Auckland, and then joined in a site compound. The end deck units incorporated the start of the arch, while the remaining three arch segments were fitted in-situ above the water.

The Old Mangere Bridge Replacement project stands as a testament to the resilience and community spirit that define Auckland. The new bridge not only provides a vital walking and cycling connection but also serves as a beacon of innovation and design excellence.

Tekla BIM Awards

The Tekla BIM Awards honor projects that transform the way the world builds.

See all projects

The Content on this page is provided to Trimble Solutions Corporation ("Trimble") under the Tekla Global BIM Awards Terms and Conditions.

Trimble Logo

INTERNATIONAL (ENGLISH)

globe wireframe
magnifying glass
Tekla logo

Productscaret icon

Tekla Structures skip iconTekla Model Sharing skip iconTekla Structural Designer skip iconTekla Tedds skip iconTekla PowerFab skip iconTrimble Connect skip iconAll products skip icon

Solutions downward-facing caret

Designright caret

Constructible modeling skip iconConceptual design skip iconStructural analysis & design skip iconDesign communication skip iconConnected design skip icon

Detailright caret

Constructible detailing skip iconConstruction documentation skip icon

Fabricateright caret

Production planning & management skip iconAutomated production skip iconConnected project delivery skip icon

Constructright caret

Bid & win skip iconSite planning & coordination skip iconConnected worksite skip icon

Educateright caret

Tekla Campus skip iconTekla for students skip iconTekla for educators skip iconTekla for academic institutions skip iconTrimble student ambassador program skip icon

All solutions

Resourcescaret icon

Articles & blog posts skip iconReferences skip iconWebinars skip iconNews skip iconEvents skip iconeBooks skip iconTekla BIM Awards skip iconAll resources skip icon

Supportcaret icon

Tekla User Assistance skip iconTrimble Downloads skip iconTekla Discussion Forum skip iconTekla Warehouse skip iconTekla Developer Center skip iconTraining skip iconAll support skip icon

Aboutcaret icon

Why Tekla & Trimble skip iconContact us skip iconCareers skip iconTekla Trust Center skip iconLicense compliance skip iconAll about skip icon

| INTERNATIONAL (ENGLISH)

globe wireframe icon

Productscaret icon

  • Tekla Structures
  • Tekla Model Sharing
  • Tekla Structural Designer
  • Tekla Tedds
  • Tekla PowerFab
  • Trimble Connect
  • All products

Solutionscaret icon

Designcaret icon

  • Constructible modeling
  • Conceptual design
  • Structural analysis & design
  • Design communication
  • Connected design

Detailcaret icon

  • Constructible detailing
  • Construction documentation

Fabricatecaret icon

  • Production planning & management
  • Automated production
  • Connected project delivery

Constructcaret icon

  • Bid & win
  • Site planning & coordination
  • Connected worksite

Educatecaret icon

  • Tekla Campus
  • Tekla for students
  • Tekla for educators
  • Tekla for academic institutions
  • Trimble student ambassador program
All solutions

Resourcescaret icon

  • Articles & blog posts
  • References
  • Webinars
  • News
  • Events
  • eBooks
  • Tekla BIM Awards
  • All resources

Supportcaret icon

  • Tekla User Assistance
  • Trimble Downloads
  • Tekla Discussion Forum
  • Tekla Warehouse
  • Tekla Developer Center
  • Training
  • All support

Aboutcaret icon

  • Why Tekla & Trimble
  • Contact us
  • Careers
  • Tekla Trust Center
  • License compliance
  • All about
  1. Home
  2. Tekla BIM Awards
  3. Old Mangere Bridge replacement
CONTACT US