Mixing installation Struyk Verwo Infra Amsterdam

Project name: 
Mixing installation Struyk Verwo Infra Amsterdam
Project category: 
Industrial
Company: 
Konstruktieburo Snetselaar BV
Country: 
Netherlands

The structure we engineered is a concrete mixing installation inside a building. The structure is designed to withstand the vertical load of the bunkers on top of it. The bunkers weigh approximately 40t each. This weight puts an extra horizontal load on the structure.

8097