Central Park in Utrecht

The Voortman Steel Construction team improved workability and maintained project speed by sharing detailed models with various construction partners.

About the project

Project category

Commercial

Company / Project parties

Voortman Steel Construction, Group A, Van der Vorm, Huygen, Peutz BV

Location

The Netherlands

Images

placeholder imageplay button

Project in numbers

Height

90 meters

Total floor area

31 596 m2

Office floors

23

Car parking spaces

535

Trimble products used

Tekla Structures

Urban office tower with ample underground parking spaces

Central Park (west flank) is an office building in Utrecht.
We have been commissioned for this project by Bouwcombinatie Westflank Noord V.O.F. We use BIM with various construction partners to carry out this project.
Total GFA: 31 596 m2
Architect: Group A
Constructor: Van der Vorm
Installations: Huygen
Building physics: Peutz BV
Ambition BREEAM – NL Score: Excellent, score of> 75% (expected)

This is a 90-meter high office building with a fantastic park of 45 meters. Central Park has 23 floors and an average floor area of 1,300 m2. The project began in 2019 and will be completed in 2022.  

Construction is taking place in two areas of the building site: the office tower and the future parking garage. There will be approximately 535 car parking spaces and 1100 bicycle parking spaces. The spaces are completely concealed below ground level and surrounding buildings to give pedestrians adequate walking space.

The BIM is managed centrally at Bouwcombinatie Westflank Noord V.O.F. The various aspect models have been made available to the various construction partners with  DocStream (information management). Verification & validation took place every two weeks at Bouwcombinatie Westflank Noord V.O.F.


One of the problems I encountered while inserting the various models was the workability in terms of speed. As the project progresses, the level of detail of the models increases, which impacts working speed.

Having the IFC models cleaned up by an IFC optimizer without losing crucial information has significantly improved workability. Interaction and communication remain important spearheads in the realization of these types of intensive projects.

Sharing models without thinking twice and hoping for the best would not be a good idea here. We used model exchange based on IFC with the BIM Basic Information Delivery Manual (IDM) as a starting point. Communication is based on BCF.
 

Tekla BIM Awards

The Tekla BIM Awards honor projects that transform the way the world builds.

See all projects

The Content on this page is provided to Trimble Solutions Corporation ("Trimble") under the Tekla Global BIM Awards Terms and Conditions.

Trimble Logo

INTERNATIONAL (ENGLISH)

globe wireframe
magnifying glass
Tekla logo

Productscaret icon

Tekla Structures skip iconTekla Model Sharing skip iconTekla Structural Designer skip iconTekla Tedds skip iconTekla PowerFab skip iconTrimble Connect skip iconAll products skip icon

Solutions downward-facing caret

Designright caret

Constructible modeling skip iconConceptual design skip iconStructural analysis & design skip iconDesign communication skip iconConnected design skip icon

Detailright caret

Constructible detailing skip iconConstruction documentation skip icon

Fabricateright caret

Production planning & management skip iconAutomated production skip iconConnected project delivery skip icon

Constructright caret

Bid & win skip iconSite planning & coordination skip iconConnected worksite skip icon

Educateright caret

Tekla Campus skip iconTekla for students skip iconTekla for educators skip iconTekla for academic institutions skip iconTrimble student ambassador program skip icon

All solutions

Resourcescaret icon

Articles & blog posts skip iconReferences skip iconWebinars skip iconNews skip iconEvents skip iconeBooks skip iconTekla BIM Awards skip iconAll resources skip icon

Supportcaret icon

Tekla User Assistance skip iconTrimble Downloads skip iconTekla Discussion Forum skip iconTekla Warehouse skip iconTekla Developer Center skip iconTraining skip iconAll support skip icon

Aboutcaret icon

Why Tekla & Trimble skip iconContact us skip iconCareers skip iconTekla Trust Center skip iconLicense compliance skip iconAll about skip icon

| INTERNATIONAL (ENGLISH)

globe wireframe icon

Productscaret icon

  • Tekla Structures
  • Tekla Model Sharing
  • Tekla Structural Designer
  • Tekla Tedds
  • Tekla PowerFab
  • Trimble Connect
  • All products

Solutionscaret icon

Designcaret icon

  • Constructible modeling
  • Conceptual design
  • Structural analysis & design
  • Design communication
  • Connected design

Detailcaret icon

  • Constructible detailing
  • Construction documentation

Fabricatecaret icon

  • Production planning & management
  • Automated production
  • Connected project delivery

Constructcaret icon

  • Bid & win
  • Site planning & coordination
  • Connected worksite

Educatecaret icon

  • Tekla Campus
  • Tekla for students
  • Tekla for educators
  • Tekla for academic institutions
  • Trimble student ambassador program
All solutions

Resourcescaret icon

  • Articles & blog posts
  • References
  • Webinars
  • News
  • Events
  • eBooks
  • Tekla BIM Awards
  • All resources

Supportcaret icon

  • Tekla User Assistance
  • Trimble Downloads
  • Tekla Discussion Forum
  • Tekla Warehouse
  • Tekla Developer Center
  • Training
  • All support

Aboutcaret icon

  • Why Tekla & Trimble
  • Contact us
  • Careers
  • Tekla Trust Center
  • License compliance
  • All about
  1. Home
  2. Tekla BIM Awards
  3. Central Park in Utrecht
CONTACT US