Bridge Finger Expansion Joints at Pier 7 - US 34 OVER THE MO RIVER

Project name: 
Bridge Finger Expansion Joints at Pier 7 - US 34 OVER THE MO RIVER
Project category: 
Infrastructure
Company: 
D.S. Brown
Country: 
U.S.

"Finger expansion joints at Pier 7 for the Relocated US 34 over the MO River. These joints were complicated because of their location between a steel girder span and a precast girder span. This created uniuque gusset plates in either side of the joint. These joints only represent 2 of the 6 joints we supplied on this project. We also were able to cordinateour model with PDM Bridge to ensure proper hole alignment with the steel diaphragms."