not-allowed-link

A 202-meter-long footbridge constructed over a railway line

Engineers used a curved ramp to build a footbridge 7.5 meters above a railway line.

About the project

Project category

Infrastructure

Company

EXCON, a.s.

Location

Czech Republic

Images

Project in numbers

Total length

202 m

Height

7.5 m

Width

3.0 m

Trimble products used

Tekla Structures

A 202-meter-long footbridge constructed over a railway line

The new footbridge, designed by SUDOP PRAHA, a.s., represents an out-of-level connection of the pedestrian road in K Dráze Street (Plzeň-Bručná) and Na Lipce Street (Plzeň-Koterov). The footbridge bridges two transport corridors – the I/20 road and four tracks of the railway line, which includes the railway line Gmünd – České Budějovice – Plzeň. The length of the bridge is 154 m with a total length of 202 m.
 
For the required crossing profile over the road and the electrified railway line, it was necessary to design the descent of the footbridge from a height of approx. 7.5 m above the terrain after crossing the railway down to the Koter abutment with an acceptable longitudinal slope. This problem was solved by a curved ramp. The footbridge was designed for pedestrian loading with the LM4 loading model, i.e., 5kN/m2, reduced with respect to the length of the loaded footbridge in accordance with ČSN EN 1991-2. The clear width of the footbridge is designed to be 3.0 m.
 

 

Tekla BIM Awards

The Tekla BIM Awards honor projects that transform the way the world builds.

See all projects

The Content on this page is provided to Trimble Solutions Corporation ("Trimble") under the Tekla Global BIM Awards Terms and Conditions.

Trimble Logo

INTERNATIONAL (ENGLISH)

globe wireframe
magnifying glass
Tekla logo

Productscaret icon

Tekla Structures skip iconTekla Model Sharing skip iconTekla Structural Designer skip iconTekla Tedds skip iconTekla PowerFab skip iconTrimble Connect skip iconAll products skip icon

Solutions downward-facing caret

Designright caret

Constructible modeling skip iconConceptual design skip iconStructural analysis & design skip iconDesign communication skip iconConnected design skip icon

Detailright caret

Constructible detailing skip iconConstruction documentation skip icon

Fabricateright caret

Production planning & management skip iconAutomated production skip iconConnected project delivery skip icon

Constructright caret

Bid & win skip iconSite planning & coordination skip iconConnected worksite skip icon

Educateright caret

Tekla Campus skip iconTekla for students skip iconTekla for educators skip iconTekla for academic institutions skip iconTrimble student ambassador program skip icon

All solutions

Resourcescaret icon

Articles & blog posts skip iconReferences skip iconWebinars skip iconNews skip iconEvents skip iconeBooks skip iconTekla BIM Awards skip iconAll resources skip icon

Supportcaret icon

Tekla User Assistance skip iconTrimble Downloads skip iconTekla Discussion Forum skip iconTekla Warehouse skip iconTekla Developer Center skip iconTraining skip iconAll support skip icon

Aboutcaret icon

Why Tekla & Trimble skip iconContact us skip iconCareers skip iconTekla Trust Center skip iconLicense compliance skip iconAll about skip icon

| INTERNATIONAL (ENGLISH)

globe wireframe icon

Productscaret icon

  • Tekla Structures
  • Tekla Model Sharing
  • Tekla Structural Designer
  • Tekla Tedds
  • Tekla PowerFab
  • Trimble Connect
  • All products

Solutionscaret icon

Designcaret icon

  • Constructible modeling
  • Conceptual design
  • Structural analysis & design
  • Design communication
  • Connected design

Detailcaret icon

  • Constructible detailing
  • Construction documentation

Fabricatecaret icon

  • Production planning & management
  • Automated production
  • Connected project delivery

Constructcaret icon

  • Bid & win
  • Site planning & coordination
  • Connected worksite

Educatecaret icon

  • Tekla Campus
  • Tekla for students
  • Tekla for educators
  • Tekla for academic institutions
  • Trimble student ambassador program
All solutions

Resourcescaret icon

  • Articles & blog posts
  • References
  • Webinars
  • News
  • Events
  • eBooks
  • Tekla BIM Awards
  • All resources

Supportcaret icon

  • Tekla User Assistance
  • Trimble Downloads
  • Tekla Discussion Forum
  • Tekla Warehouse
  • Tekla Developer Center
  • Training
  • All support

Aboutcaret icon

  • Why Tekla & Trimble
  • Contact us
  • Careers
  • Tekla Trust Center
  • License compliance
  • All about
  1. Home
  2. Tekla BIM Awards
  3. A 202-meter-long footbridge constructed over a railway line
CONTACT US