Expo 2020 Dubai will host the world for 173 days, each one brimming with new experiences. It’ll be a time to create, collaborate and innovate. And it’s going to be fun. We’re talking eye-catching, mind-bending, taste bud-tickling, grin-inducing, good-weird, did-that-really-just-happen fun. Come along, or spend a lifetime telling less interesting stories.
Tiger Steel was responsible for the connection design, steel detailing, fabrication and construction of the project and ALEC is the main contractor.
CHALLENGE AND SUCCESS
The 3D structure and complex connections were a real challenge. Tekla Structures was used to overcome this and its main advantage was how the software helped coordinate with other trades.
ABOUT COMPANY
With more than 1,800 employees and availing on more than 320,000 m2Â at our facilities in Abu Dhabi and Sharjah, Tiger Steel has the capabilities to deliver in excess of 5,000 tons of structural steel monthly, whether the project is an Oil, Gas or Power Plant, an infrastructure development such as an airport terminal or a high-end commercial center.