Reducing Waste - Virtual Design & Concrete Construction With Weitz

International

Investing in Tekla to eliminate waste and drive savings, Jared Schleifer of The Weitz Company, USA, reports a 22% reduction in rebar requirement alone. The goal for this contractor was to reduce some of the common "big building wastes" of material overproduction; non-productive waiting time; defects and rework. The solution was to change their processes and adopt Tekla to drive Building Information Modelling (BIM) within Weitz.

With reference to two projects, Jared will reveal in this webinar how they improved predictability and efficiency on their jobs.

Sign up now to this webinar and discover how:

  • Weitz approach Virtual Design & Construction (VDC) & BIM as a contractor concerned with concrete.
  • The solution is employed to add value through the lifetime of the project.

Watch this webinar