Lake Constance 5D Conference 2015

“From Strategy to Implementation – bringing 5D to the heart of construction“ is the title of the 2015 Lake Constance 5D Conference, which will take place on May 4-5, 2015 in Constance, Germany. The event aims to combine strategic aspects of 5D processes and practical approaches to 5D implementation as never before an is organized by the 5D initiative and the University of Applied Sciences (HTWG) Constance.

Tekla will be organizing the participation at the international event on behalf of the Trimble Group which is supporting the conference as a main sponsor.

For further information please visit the Visit the 5D-Conference website.

Flyer of the event

Presentations and program

Conference Presentations of Trimble, Tekla Customers and Partners

Trimble & Partner Presentations

  • Implementing True 5D - 4 Hospital Case Studies
    Christoper Mouflard, Trimble
  • An Element Based Information System with FM Deliverable Use of Industry Foundation Classes (IFC) in a Collaborative Environment
    Marcel Broekmaat, Trimble
  • Integrated Document Control and 2D Quantity Takeoff
    Duane Gleason, Trimble
  • Taking your existing buildings to 6D BIM
    Joseph Poskie, Trimble
  • Bridging the Chasm between BIM and FM Robert Fahlin, Matt Laing, TrimbleBIM Implementation in Switzerland
    Akos Hamar,Building Point AG (Trimble Partner)

Trimble Labs:

  • 5D Its Worth It Workshop - Get hands on with integrated Design, Schedule and Cost
    Christopher Mouflard, Trimble
  • Improved BIM 3D / 2D Quality Takeoff and Estimating Integration
    Steve Watt Trimble
  • Material Tracking in Construction Workflows
    Jesse Lavine, Trimble
  • Using Field Technologies to Ensure That Construction Intent Matches Field Reality
    Bryan Williams, Trimble

Tekla Customer Presentations:

  • Advanced cast in place structures within building and civil engineering works industrialized for effi cient production and logistics
    Stefan Brandt, Jens Fobian-Larsen, CN3 - Construction+iNNovatioN
  • 5D use case in design phase – Intensive Big Room
    Otto Alhava, Fira Palvelut
  • The Use of modifi cation of PPC measurement in design management
    Jouni Juntunen, Fira Palvelut
  • BIM - a real world test with alternate understanding of Processes - Reference- processes that also show an international way to go with BIM
    Franz Madl, PBB

 

 

Date: 
Monday, 4 May 2015 - 9:00am to Tuesday, 5 May 2015 - 5:00pm
Location: 
Konzil Konstanz
Hafenstraße 2
78462 Konstanz
Germany