Steel Erection 

Erection of steel unitsUsing Tekla Structures software helps ensure that the right steel elements are delivered and erected on time. Specific information and requirements created during both the detailing and fabrication phases result in added value to the construction process.

Leveraging the model downstream

Tekla Structures includes tools that check against possible plant design inconsistencies before the fabrication and erection phases. Users can add comments directly to the 3D model to highlight and expose problem areas.  

Site and project management

Erection scheduleThe Tekla model can be used to prevent costly erection delays. Advance planning and coordination helps ensure that equipment and fabrication deliveries arrive in the correct sequence. 

Project communication is faster and more accurate using the Tekla model rather than marked up drawings. Information can be shown graphically to create a better understanding of overall status.

 

Tekla Structures software allows users to
  • Generate field bolt lists
  • Add status information to project reports
  • Manage center of gravity locations on assemblies
  • Create reports on number of assemblies per sequence
  • Plan truck load deliveries

See software configuration