BIM projects - Vote for your favorite!
John and Mary Brock Football Facility by Barton Malow , Atlanta, GA

The John and Mary Brock Football Facility is located in Atlanta, Georgia and provides The Georgia Institute of Technology (Georgia Tech) with a climate controlled, closed practice facility for its championship football team.

BIM Category Winner!
Houston Dynamo Stadium by CSD Services , Houston, TX

BBVA Compass Stadium, new home to the 2-time Major League Soccer Champions the Houston Dynamo, is a multi-use arena to serve a professional soccer team, a local small college football team and other venues, including concerts.

Ralph L. Carr Colorado Judicial Center by Martino and Luth Inc. , Denver, CO

Colorado Judicial Center is a neoclassical four-story courtroom building. Completion is scheduled for the winter of 2013.

Music City Center by Axis , Nashville, TN

The total land area of the site is 16 acres and features a 65-foot difference in elevation from the northwest corner of the site to the southeast corner. The total square footage of the facility, including parking, is 2.1 million square feet. The actual building is 1.2 million square feet...

Tuscany Elementary School by Blach Construction Company

The new Tuscany Elementary School (initially called Monte Bella Elementary School) is being constructed on a 13 acre site in Salinas, CA. The project consists of six wood framed structures and one hybrid wood/steel structure that totals 49,150 SF of occupied spaced. The GMP for this project is 18.2 million and the 14 month schedule will be complete in 2013.

Alta Bates Summit Medical Center Patient Care Pavillon by DPR, Oakland, CA

The addition to The Alta Bates Summit Medical Campus (ABSMC) is a $289 million, 13 story patient care pavilion and future home of over 200 licensed beds beginning January 2014. Our highly collaborative Integrated Project Delivery (IPD) team was faced with many challenges.

Modular Pipe Rack by ConXTech , Central California

With over 1400 assemblies yet only 20 shop drawings, the detailing, fabrication, and erection on this Water Treatment Plant was greatly simplified using the [Tekla User] Modular Pipe Rack system.

UC Merced Student Housing 4: The Summits by ConXTech , Merced, CA, USA

This project is a five-story, 110,000 square foot Student Housing Facility. This project utilized BIM integration and clash management. *.ifc format models were imported into Tekla BIMsight and reviewed at weekly collaboration meetings. Further clash prevention was accomplished in Navisworks via output from Tekla Structures, where in-model comments were flagged for project participants to investigate before the next gathering.

Buck Creek Pipe Bridge by Marquette Steel Supply & Fabrication , Wedron, IL

Fairmount Minerals is a leader in the exploding frack sand mining industry. The company is in the process of a major expansion of their Wedron, IL plant. They need a bridge to carry fresh water piping to the mining face and slurry pipes back to the process buildings.

Guatemala Lead, Zinc & Silver Mine by M3 Engineering & Technology , Guatemala

[Tekla User] is pleased to submit this Guatemalan mining, material conveying and processing facilities project for the North American Tekla Structures 2012 BIM Awards consideration. This project consists of the conveying, crushing and milling circuits for a new Guatemalan lead, zinc and silver mine.

516 North Lake Shore Drive Apartments by Adjustable Forms , Chicago, IL

The project features 500 luxury apartments over 45 levels in Chicago's Streeterville Neighborhood. To the south of the residential tower is an 11 story parking garage with a rooftop amenities deck. Adjustable Forms utilized its building information modeling (BIM) abilities to fully model the parking garage and residential towers.

Clark & Grand Hotels by Adjustable Forms , Chicago, IL

This 20 story hotel project features three distinct hotel brands in one structure. Catering to business travelers with various needs, Clark & Grand Hotels will feature 621 units split between the ALOFT, Hyatt Place, and Fairfield Inn & Suites brands. The three core walls are placed utilizing hydraulic self-rising cores.

Manitoba Hydro Spillway Replacement by KGS Group, Manitoba, Canada

The Manitoba Hydro Spillway Replacement project is an innovative spillway replacement project currently under way. This project involved major earthworks and cast in place components including 30,000 m3 of concrete and 145 tonnes of reinforcing steel.