The new headgear is part of the conversion of the South Deep vent shaft into a production shaft...
The new domestic and international terminals are the feature point of the new complex...
Larsen Toubro IES division modeled the clinker silo roof supporting structure for Angola Cement Project...
The project includes steel structures for a number of buildings that together form Incinerator Central Brista 2...
Zibo Gymnasium is a part of Zibo Sports Center. The outer contour is close to oval, with the size of 146m by 115m...
After almost a year of engineering and drafting, the construction of the Floriade-bridge was finally finished...
The subject of the design is steel supporting structure of the belt conveyors for an aluminum smelter...
In the English style football stadium the 25,000 seats will be located close to the game...
Morocco Mall manages the rare achievement of true union of local and global styles in one building...
The workshop structure is part of the Medupi Power Station currently under construction just in Limpopo province...
Utrecht without music on the Vredenburg cannot exist. At the same place where once was the Music Center Vredenburg...
The 180 meters long cable-stayed pedestrian bridge is currently under construction...
Construction of the the pedestrian bridge is to be finished 2012/2013. The steel arches of this elegantly curved bridge...
A multinational petroleum company intends to develop the hydrocarbon reserves in the UK sector of...
The Cape Lambert Port B Project comprises the construction of a new port facility adjacent to the existing facility...
The model of football and athletic stadium stands seat altogether 5000 spectators and the cost of the project was about...
The Capital Market Authority office tower (CMA) is located at new King Abdullah Financial District...
The Emirates Air Line (also known as the Thames cable car) is a cable car link across the River Thames in London...
The Shard is the tallest building in Western Europe, a 310 meter (1,016 foot), 95-story vertical city...
The project was a great challenge for Estructuras Lym's Tekla modelers. Structure was curved in both directions...
Being a fast track project, like many in the industry today, Trekkopje was done in stages...
The Investors Group Field is composed of 9000 tons of steel, 28,000 cubic meters of concrete, 3500 sections...






















